-
Your shopping cart is empty!
Your shopping cart is empty!
Sorry, this is a Pre-order item only. You can call us on 01482 460933 with your requirements and we inform you of any estimated delivery times.
Aim
Acoustic Performance
Where the barrier is installed beneath a partition line into an imperforate timber based access floor system of at least 30mm thickness, with floor covering over, the room-to-room sound reduction on the path of the fire barrier will be at least 45dB.
The AIM Raised Access Floor Fire Barrier must faithfully follow all the partition lines directly above, and be compressed in installation as per AIM instructions, with no gaps.
The partition must achieve at least 45dB SRI and similar acoustic consistency provisions be made at ceiling and further, similar, room-to-room interfaces.
Service Penetrations
This system and its components have been assessed by Exova Warrington to provide an effective solution for handling a wide variety of service penetrations running within the raised access floor void.
Tags: pfb60 fb004
